Frequently
Asked Questions
Everything clients ask us about pricing, permits, timelines, living through construction, and what happens after we finish.
General
Are you licensed, insured, and WorkSafeBC covered?
Yes to all three, and we provide certificates before work begins.
Verify this with every contractor you interview. If an uninsured contractor's worker is injured on your property, the liability exposure can land on you personally.
Do you offer free estimates?
Yes. The initial consultation, site visit, and preliminary budget conversation are free with no obligation.
Once the project moves into measured drawings, design development, and engineering coordination, that work is contracted and billed, and a portion is typically credited against the build contract on projects that proceed.
What areas do you serve?
Sixteen Lower Mainland municipalities: Surrey, Langley, Burnaby, Coquitlam, Port Coquitlam, Port Moody, Richmond, Delta, White Rock, New Westminster, Vancouver, North Vancouver, West Vancouver, Maple Ridge, Pitt Meadows, and Abbotsford.
No travel surcharge applies within any of them.
How soon can you start?
It depends on current workload and whether permits are required. Interior work with no permit requirement can often start within a few weeks.
Anything requiring municipal review has to wait for that process, and review times vary significantly between municipalities. We give you a realistic date rather than an optimistic one.
Pricing and Contracts
How do you price a project?
After a site visit, you get an itemized written estimate broken into construction, mechanical, electrical, millwork, finishes, and allowances, with a stated contingency.
Allowances are set at realistic numbers for the quality level you actually want, not artificially low figures that guarantee an overage later.
What is a contingency and why do I need one?
A reserve for conditions that cannot be seen until walls are open: undersized framing, old wiring, rot at a sill plate, a foundation that is not what the drawings showed.
On older homes it is not optional. A contractor who quotes with no contingency is either absorbing the risk in an inflated price or planning to come back to you for more money later.
How are payments structured?
A deposit at contract signing, then progress payments tied to defined construction milestones, with a holdback until deficiencies are corrected.
We do not ask for large cash payments up front. A contractor requesting most of the contract value before work starts is a serious warning sign.
How are changes handled?
With a written change order stating the cost and schedule impact, issued and approved before we act on it.
Nothing appears on a final invoice that you have not already seen and agreed to in writing.
Permits and Compliance
Do you handle permits?
Yes, end to end. Application, engineering coordination, and inspections through to final sign-off.
We do not build unpermitted work. It creates problems with insurance, with municipal enforcement, and at resale, and the short term saving is not worth it.
Do I need a permit for my project?
Generally yes for structural changes, plumbing relocation, added circuits, new floor area, suites, and decks above a certain height. Generally no for like-for-like finish replacement in an existing layout.
Requirements vary between municipalities and strata buildings add their own approval process. We confirm for your specific project and address.
What about asbestos and hazardous materials?
WorkSafeBC requires a hazardous materials survey before demolition on pre-1990 buildings. We arrange it as a standard first step and coordinate licensed abatement where anything is found.
This is not an area where we cut corners, and any contractor offering to skip it should be treated as a serious warning sign.
Can you make an existing unpermitted suite legal?
Often, yes. It typically involves bringing egress, fire separation, ventilation, and electrical up to current requirements and taking it through the permit process.
We assess the existing suite first to establish what is actually required, because the scope varies enormously depending on how it was originally built.
During Construction
Can I live in my home during the work?
For single room projects and most additions, yes, with dust containment and protected access routes.
For a full gut with no functioning kitchen and extended utility interruptions, no. We will tell you honestly which situation you are in during scoping so accommodation can be budgeted.
How will you keep me updated?
A written update every week covering what was completed, what is next, any decisions we need from you, and status against schedule and budget.
Your project manager is reachable directly throughout. You will not be routed through a call centre.
What are your working hours?
Typically {esc(SITE['hours'])}, subject to municipal noise bylaws and strata building rules, which vary.
On commercial projects we schedule after hours and weekends where that keeps a business operating, and we price that accordingly.
How do you protect the rest of my house?
Dust containment at the work area boundary, floor and surface protection on access routes, and a tidy site at the end of each day.
On larger projects we use negative air where the dust load justifies it, particularly during demolition and drywall sanding.
After Completion
What happens at the end of a project?
A formal walkthrough with you and a written deficiency list. Everything on it is corrected before final payment, not after.
You then receive warranty documentation, product and finish specifications, paint colours, and maintenance guidance in one package.
What warranty do you provide?
Workmanship is warrantied, and all manufacturer warranties on products and materials pass through to you with the documentation collected at handover.
New home construction in BC additionally requires third party home warranty insurance, commonly two years on labour and materials, five on the envelope, and ten on structure.
What if something goes wrong after you finish?
Call us and we come back. We also do a follow-up visit after the first season of use to adjust cabinetry and doors, which naturally settle through the house's first heating cycle after a renovation.
That settling is normal and it is easier to correct with one visit than to leave.
Will the renovation add value to my home?
Generally, though it varies by neighbourhood and by what you spend it on. Kitchens, bathrooms, added legal square footage, and systems upgrades tend to return well across the Lower Mainland. Highly personalized finishes return less.
We are not appraisers and will not promise a figure, but we will flag during design when a choice is unlikely to be recovered at resale.
Service and Area Specific Questions
Every service page and every city page carries its own FAQ section covering what is specific to that scope or that municipality.
Kitchen Renovations
Custom cabinetry, stone surfaces, structural openings, and the trades coordination that keeps a kitchen build on schedule.
Explore Service
Bathroom Renovations
Ensuites, main baths, and powder rooms with waterproofing done to standard, not to the minimum.
Explore Service
Basement Development & Suites
Unfinished basements into living space or a legal, permitted, revenue-generating suite.
Explore Service
Home Additions
Second storeys, rear extensions, and garage conversions that read as original to the house.
Explore Service
Whole Home Renovations
Full interior rebuilds and layout reconfigurations delivered under a single contract and one schedule.
Explore Service
Custom Homes & New Builds
New builds from raw lot to occupancy, with the design, permitting, and trades managed end to end.
Explore ServiceStill Have a Question?